EN

非常规完井和可溶技术
魔法师全金属可溶球座
更可靠的金属密封环替换了传统的胶筒密封件,提高完井作业效率和可靠性。除了应对正常作业的常规设计以外,该产品也具备应对超高温高压和严重套管变形的特殊设计。

了解更多

变色龙可溶桥塞
变色龙可溶桥塞基于传统设计,并经过多年大批量应用和优化,将性能和溶解的平衡达到巅峰。可满足多种应用工况,如压裂桥塞,或死堵桥塞。

了解更多

可溶技术
可溶技术(隐藏)
智能滑套技术

VISTA远景无限级压裂滑套系统

VISTA远景无限延时开启趾端滑套

可溶产品附件

动态温度记录仪

Casing size

6"

5.5"

5"

4.5"

3.5"

23 ppf
17 ppf 20 ppf 23 ppf
21.4 ppf
13.5 ppf 15.1 ppf
9.2 ppf
Manual input
Tool Type
Bridge plug Frac plug (Ball drop) Frac plug (Ball in place)
What is your application?
Proppant frac Acid frac Refrac Workover
Expected challenges
Casing restriction Acidic wellbore fluid High temperature High pressure Not much
Pressure
15kpsi 10kpsi
Temperature
Below 140°F In between Above 280°F
Salinity
Fresh water Below 3% Above 10%
Pressure holding time
2-6 hrs 6-12 hrs Above 12 hrs
Dissolving time
Fully dissolved in 1-3 days Fully dissolved in a week
Would you like to eliminate coiled tubing
clean out runs for real?
No, clean out runs are needed to get the sand and debris out of my wells.
Getting rid of coiled tubing is not beneficial for me.
I'd love to try
Do you need pump ring for the job?
Yes No

We recommend CHAMELEON for your application.

Our design was field proven in North Sea work over operations.

We recommend WIZARD for your application.

It is widely used in daily frac operations, for both low and high, 10k - 15k.

We recommend WIZARD HEDP for your application.

Dealing with down hole restriction is our specialty. We have the perfect weapon for these nightmares. Our latest hyper expansion frac plug can expand up to 52% from its original OD.

We recommend WIZARD coated for your application.

Our D.ARMOR coating is able to prolong our frac plug's exposure under harsh down hole environment, such as acid and high salinity.

We recommend ZERO for your application.

Flowing back debris and sand thru conventional frac plug's small ID can be a problem, but not with ZERO.

Request Quotation

After submitting the information, our engineers will contact you as soon as possible
Submit