EN

钻井及数智科技
IPC-MPD智能压力控制钻井系统
配备高精准度全电动直驱节流阀,更紧凑的设计,自适应算法,满足各种场景的控压钻井作业需求。

了解更多

iRCD 全电驱智能旋转控制系统
iRCD颠覆常规控压钻井设备的配置模式,实现了井口装备(RCD-旋转控制系统)与地面装备(MPD-控压钻井管汇)的核心控制功能组件一体化集成解决方案,可将传统钻机转换为具备控压钻井作业能力的钻机系统,并结合IoT技术通过远程支持实施控压钻井作业。

了解更多

HOLOWELLS
井工程数字孪生平台
HOLOWELLS井工程数字孪生平台是利用实时渲染技术对油气井作业地面及井下场景进行精细建模,整合井工程大数据分析和AI大模型,为油气能源上游行业量身打造的一款次时代智慧数字孪生平台,旨在为油气能源企业提供一套能够解决工程痛点且支持私有部署的全新可定制化的井工程管理解决方案。

了解更多

XRSim 工程仿真模拟系统
维泰自主研发的XRSim工程仿真模拟系统,区别于传统的虚拟现实培训形式,通过整合多种混合现实技术,在全仿真环境中为使用者提供身临其境的体验,有效解决了训练内容单一、训练结果不佳、团队协作缺乏以及场景不真实等问题,直击了传统虚拟现实培训方式的关键痛点和难题。

了解更多

AXON井工程大数据分析平台
维泰AXON井工程大数据分析平台通过大数据分析处理技术和人工智能大语言模型,结合井工程业务逻辑,对钻完井作业过程中的结构化数据与非结构化数据进行深度分析,实时生成分析结果,提升工程数据资产利用效率,助力钻完井作业提速增效。

了解更多

智能井控技术
数智科技
套管附件解决方案

CST过钻杆水泥伞

S2整体式弹性扶正器

Casing size

6"

5.5"

5"

4.5"

3.5"

23 ppf
17 ppf 20 ppf 23 ppf
21.4 ppf
13.5 ppf 15.1 ppf
9.2 ppf
Manual input
Tool Type
Bridge plug Frac plug (Ball drop) Frac plug (Ball in place)
What is your application?
Proppant frac Acid frac Refrac Workover
Expected challenges
Casing restriction Acidic wellbore fluid High temperature High pressure Not much
Pressure
15kpsi 10kpsi
Temperature
Below 140°F In between Above 280°F
Salinity
Fresh water Below 3% Above 10%
Pressure holding time
2-6 hrs 6-12 hrs Above 12 hrs
Dissolving time
Fully dissolved in 1-3 days Fully dissolved in a week
Would you like to eliminate coiled tubing
clean out runs for real?
No, clean out runs are needed to get the sand and debris out of my wells.
Getting rid of coiled tubing is not beneficial for me.
I'd love to try
Do you need pump ring for the job?
Yes No

We recommend CHAMELEON for your application.

Our design was field proven in North Sea work over operations.

We recommend WIZARD for your application.

It is widely used in daily frac operations, for both low and high, 10k - 15k.

We recommend WIZARD HEDP for your application.

Dealing with down hole restriction is our specialty. We have the perfect weapon for these nightmares. Our latest hyper expansion frac plug can expand up to 52% from its original OD.

We recommend WIZARD coated for your application.

Our D.ARMOR coating is able to prolong our frac plug's exposure under harsh down hole environment, such as acid and high salinity.

We recommend ZERO for your application.

Flowing back debris and sand thru conventional frac plug's small ID can be a problem, but not with ZERO.

Request Quotation

After submitting the information, our engineers will contact you as soon as possible
Submit